Teresa studied her niece. "You sound older than twenty-eight."
"I feel older than twenty-eight."
"You still have to laugh sometimes."
"I laughed yesterday. One of the lambs got its head through a feed ring and looked offended when I helped it out."
Teresa snorted. "Well, there's progress." Then she took Maggie's hand across the kitchen table and asked whether she had been eating properly. Maggie admitted that the answer depended on what counted as dinner. Teresa opened the refrigerator, surveyed the collection of pickles, milk, and half a casserole, and announced that she would be back in an hour with groceries.
Meanwhile Aaron had begun finding pieces of D-17's history. The road-widening project had occurred in 2004. County records showed replacement of one culvert under the road, a revised outlet profile, and work on a private drain that crossed the Whitaker property. The file contained correspondence with a drainage district trustee who had since died. It also contained a sketch, dated two weeks after final construction, showing an additional outlet connection not present on the initial plan. The name of the contractor was Prairie Valley Earthworks. Maggie recognized it at once. The company had done tile repairs for Everett in the late 2000s.
Aaron called her from the office and stressed that a contractor's involvement did not establish wrongdoing. A road job could involve multiple parties. A private landowner might pay for related work, and later maintenance could be lawful even if files were poorly organized. He needed a complete record of permits, district authority, and field conditions. Maggie appreciated the caution, though impatience seemed to live inside her chest now like a second heartbeat.
A week later the county hired a drainage inspection crew to survey the public structures. The crew used video equipment where access and conditions allowed and confirmed that the road culvert discharged toward a buried downstream connection. Sediment obscured part of the line, and the camera could not reach the far junction. There was evidence of a lateral connection carrying runoff from a private property uphill, but its precise route required further investigation. The crew also discovered that the outlet grade differed from what the original design called for, enough to deserve a closer survey but not enough to identify the cause without more measurements.
When Maggie asked whether anyone had deliberately changed the system, Aaron shook his head. "We don't know that. There may be a design revision, a repair, an error, or a combination. Let's establish the physical facts before we assign motive." He added that a drainage district matter could require review by the appropriate trustees or county authorities, depending on ownership and legal status. Maggie realized that his job was partly to resist the stories people wanted to tell him. His caution protected her from building a case on assumptions that might collapse later.