They Mocked a Single Dad as a Washed-Up Mechanic — Then a CEO Walked Into His Garage

Chapter 25

Theme:
Font Size:
24px

He called Sophia the next morning. She picked up on the second ring, which told him something about how she operated. " I have your proposal,"he said. " My attorney is reviewing it." "

Good. " Her tone was straightforward. No indication of surprise at the attorney. Anything you want to discuss before the formal response?

The defense applications question. We talked about it briefly when you were here and I said I needed more information. Yes, I'd like that information before we go further. There was a beat on the line.

Not long, maybe 2 seconds, but he registered it. That's fair. She said, ""Can we set up a call?"I'd like to walk you through the specific project. Some of what I'd tell you would be under NDA, which means I'll need you to sign something limited before the call.

Just covering the project specifics, not the broader partnership terms that I can do without my attorney. That one, yes, it's standard confidentiality for project disclosure, not the substantive deal terms. He agreed to a call for the following Monday. He signed the limited NDA.

Carol looked at it and cleared it in about 15 minutes. And on Monday morning, sitting at the kitchen table with coffee that he actually remembered to drink while it was hot, he called Sophia's number. The project she described was he would think about this later, trying to find the right word for it, larger than he'd let himself imagine. Vidian had a development contract for a thermal management system for a new class of hypersonic vehicle.

The application was dual use, civilian research, and yes, potential military procurement. The vehicle's propulsion system generated heat at operational temperatures and cycling frequencies that existing thermal management solutions couldn't sustain without component degradation that made extended operation impractical. Ryan's geometry, according to Sophia's thermal engineers, who had been running models against his data since the day they'd left Cedar Creek, addressed the problem directly, not partially, not as a contributing factor, directly. The models show your pathway geometry maintaining efficiency at temperatures 22% above our current systems failure threshold.

Sophia said our lead thermal engineer used the word elegant which he has never in my experience used to describe anything. " James,"Ryan said. " James. " Ryan was quiet for a moment staring at the kitchen table.

There was a small ring stain from a coffee cup which he'd been meaning to address for a month. He stared at the ring stain. " What's the timeline on this project?"He said, "We have a development delivery date 14 months out, which means we need to be in advanced testing on the thermal system within 6 months. 6 months to go from my seventh prototype to application testing.

We have the resources to move fast. What we don't have, what we couldn't build in 8 months of trying was the foundational geometry. You built that. We scale it.

News in the same category

They Mocked a Single Dad as a Washed-Up Mechanic — Then a CEO Walked Into His Garage

50 Part