They Mocked a Single Dad as a Washed-Up Mechanic — Then a CEO Walked Into His Garage

Chapter 24

Theme:
Font Size:
24px

Not long, maybe 2 seconds, but he registered it. That's fair. She said, ""Can we set up a call?"I'd like to walk you through the specific project. Some of what I'd tell you would be under NDA, which means I'll need you to sign something limited before the call.

Just covering the project specifics, not the broader partnership terms that I can do without my attorney. That one, yes, it's standard confidentiality for project disclosure, not the substantive deal terms. He agreed to a call for the following Monday. He signed the limited NDA.

Carol looked at it and cleared it in about 15 minutes. And on Monday morning, sitting at the kitchen table with coffee that he actually remembered to drink while it was hot, he called Sophia's number. The project she described was he would think about this later, trying to find the right word for it, larger than he'd let himself imagine. Vidian had a development contract for a thermal management system for a new class of hypersonic vehicle.

The application was dual use, civilian research, and yes, potential military procurement. The vehicle's propulsion system generated heat at operational temperatures and cycling frequencies that existing thermal management solutions couldn't sustain without component degradation that made extended operation impractical. Ryan's geometry, according to Sophia's thermal engineers, who had been running models against his data since the day they'd left Cedar Creek, addressed the problem directly, not partially, not as a contributing factor, directly. The models show your pathway geometry maintaining efficiency at temperatures 22% above our current systems failure threshold.

Sophia said our lead thermal engineer used the word elegant which he has never in my experience used to describe anything. " James,"Ryan said. " James. " Ryan was quiet for a moment staring at the kitchen table.

There was a small ring stain from a coffee cup which he'd been meaning to address for a month. He stared at the ring stain. " What's the timeline on this project?"He said, "We have a development delivery date 14 months out, which means we need to be in advanced testing on the thermal system within 6 months. 6 months to go from my seventh prototype to application testing.

We have the resources to move fast. What we don't have, what we couldn't build in 8 months of trying was the foundational geometry. You built that. We scale it.

She paused. I know this is a lot to take in. I'm taking it in. I want to be direct about something else.

Her voice changed. Not softer exactly, but more deliberate. We're not just looking for a licensing deal here, Ryan. I want you involved in the development process.

Directly involved. Your understanding of this system, the intuitive grasp of what the geometry does and why is not something we can fully extract from the notebooks. I want you on the project. Ryan stood up from the kitchen table.

He wasn't sure why. He just couldn't sit still anymore. He walked to the window. The garage was visible from here.

News in the same category

They Mocked a Single Dad as a Washed-Up Mechanic — Then a CEO Walked Into His Garage

50 Part