Two days later, Cross Development sent him a letter claiming he had exceeded the intended scope of the equipment sale by removing engineering documents from the annex. Daniel showed the letter to a local lawyer, Elise Mercer, who specialized in commercial disputes. Elise read the bill of sale and the attorney's amendment. "Their position isn't especially strong," she said, "but that doesn't mean they can't make you spend money defending yourself. Keep the original records safe, don't publish any private company material, and let me respond."
Daniel had no interest in a public battle, but the letter reached Rosa, who was furious. "They laughed at you for buying garbage," she said. "Now that it might be useful, they're inventing reasons it still belongs to them." Daniel understood the feeling. He also knew anger did not establish title. The records had been abandoned in a structure the company agreed to sell with its contents. Elise's response laid out the language, offered to provide copies of nonproprietary historical records, and asked Cross Development to identify any specific document it claimed had been excluded. The company's lawyers did not identify one.
The city's survey changed everything. Ground-penetrating work and inspection from authorized access points showed that the channel was not completely blocked. Part of it had collapsed near the proposed parking structure, and its outlet was obstructed by decades of sediment. The condition was serious enough that the city suspended approval of construction in that section until a flood-risk assessment could be completed. The utilities director emphasized that nobody had proved an imminent disaster. The development could still proceed with a redesigned drainage plan. But the schedule Vivian had promised investors was no longer credible.
Vivian heard about the city meeting through a project coordinator who had attended on behalf of the planning office. He mentioned the old annex, an unexplored water channel, and Daniel Rowan's inventory of pump patterns. Vivian asked what any of it had to do with the waterfront project. The coordinator said he was not certain. Her first impulse was to dismiss the concern. Instead, she requested the archived site plans and asked Martin whether an underground-utility survey had been completed. Martin said the feasibility consultant had relied on available municipal maps. Vivian asked a different question: had anyone physically inspected the historic culvert? Martin checked the report while she waited. He found a sentence recommending further verification before foundation design. The consultant had marked the recommendation unresolved.
"Why is this the first time I'm hearing about it?" Vivian asked.
Martin answered too quickly that the matter had been considered minor. She looked at him for a long time. "Minor because somebody measured it, or minor because we were all in a hurry?" He did not answer. She sent a written request for a survey that afternoon, but the project deadline remained unchanged. That contradiction would haunt her later. She had begun to recognize the problem without yet accepting its cost.
The survey team arrived after two days of heavy rain. They found standing water near the old test channel and a section of brickwork that looked sound until a probe revealed missing mortar deep behind the face. The engineer in charge recommended restricting heavy vehicle access to the area and